HSM Contracting was engaged by Wentworth Cattle Station, a long-standing and valued client, to undertake critical dam remediation works aimed at restoring water storage capacity, improving structural integrity, and ensuring the long-term reliability of key water infrastructure across the property. The project was delivered as part of ongoing property improvement initiatives to support sustainable livestock operations and drought resilience.
The scope of works included desilting and reshaping of the existing dam structure, repairs to eroded batters and spillways, construction of new access points for maintenance, and reinstatement of embankments using locally sourced materials. HSM Contracting worked closely with station management to schedule works around operational requirements, ensuring minimal disruption to daily station activities and livestock movements. The project was completed safely, efficiently, and to a high standard, further strengthening the long-term relationship between HSM Contracting and Wentworth Cattle Station.
