Contract engaged to construct over 14km of Light Vehicle Access roads on the Peak Downs Mine as part of the company’s ongoing policy to segregate Heavy Vehicles and Light Vehicles.
The scope of works comprised of clearing and grubbing of site, bulk earthworks, construction of 10.6 km access road.
- Build earthworks comprising of cut and fill
- Drainage CSP Ranging from 400mm diameter to 1650 mm diameter
- Haulage of subgrade material and capped with 200mm reject and placement to finished level. All trim conducted using GPS Grader systems